The extensive refurbishment of Cardiff University’s Bute Building has been completed.
The extensive refurbishment of Cardiff University’s Bute Building – home to the internationally-renowned Welsh School of Architecture (WSA) for more than 100 years – has been completed. The project has formed part of Cardiff University’s biggest campus upgrade in a generation, which has seen more than ÂŁ600m invested in research and teaching facilities.Originally designed by Sir Percy Thomas, the Grade II listed Bute Building has undergone a ÂŁ9.7m renovation that has completely modernised the facilities with the addition of new studios, offices, workshops and a state-of-the-art exhibition hall. Global, interdisciplinary design practice, BDP, was the project architect.
The refurbishment has been designed alongside a new offering of postgraduate and undergraduate programmes, as well as to provide an enhanced studio culture within the WSA. It has included extensive renovation of the building’s interiors, such as the creation of larger, lighter and more flexible studio spaces, and the repair and upgrade to the roof.
The WSA’s workshop facilities have also been relocated and significantly expanded with an enlarged wood and metal workshop, digital fabrication facilities to produce models using the latest laser cutting, 3D printing and CNC (Computer Numeric Control) technologies, and an enhanced space for the WSA’s robotic arm.
At the front entrance of the building, an exhibition space and Living Lab have been created to help strengthen links between the staff and students at the WSA, architectural practices and local communities.
The project has also helped to uncover and reinstate the original Assembly Hall, a two-storey space at the heart of the building, which was previously concealed following its conversion to a lecture theatre in the 1990s. A key feature of the Bute Building’s heritage and Grade II listed status, this new Exhibition Hall, which opened last month, will be the centrepiece of the building.
BDP introduced natural ventilation towers to the roof of the second floor studios, which help draw fresh air into the lower levels of the building and improve the quality of the internal environment. Meanwhile, a new hybrid studio space in the teaching area allows individual and group tutorials to run concurrently thanks to the introduction of adaptable infrastructure and acoustic treatment to walls and ceilings.
This project was delivered in collaboration with Capita (project management), Gleeds (cost management), Aecom (structural and civil engineering) and CPWP (environmental engineering). The main contractor appointed to carry out the works was R&M Williams.




